Bringing Logan property owners and residents together to stay informed, speak up, and help shape the future of our neighborhoods, so the decisions made about our community are made within our community.

Photo: Francisco Kjolseth | The Salt Lake Tribune | Logan Canyon in 2023

We are the landowners, longtime residents, and neighbors who believe property rights matter. When the government moves to take private property along Canyon Road through right of way acquisition and eminent domain residents deserve transparency, fair treatment, and a real voice - not decisions made behind closed doors.

DISCLAIMER: The information on this site comes from publicly available sources and has not been independently verified. It is for general informational purposes only and is not legal advice. See below for full disclaimer.

DISCLAIMER: The information on this site comes from publicly available sources and has not been independently verified. It is for general informational purposes only and is not legal advice. See below for full disclaimer.

Let’s get you up to speed!

Infographic outlining the First Dam Tank & Waterline Project in Logan, UT. A $70 million water project consisting of 10-million-gallon storage tank, 42-inch water line that supplies West Logan with water from First Dam, and Canyon Road improvements.
Infographic outlining the First Dam Tank & Waterline Project in Logan, UT. A $70 million water project consisting of 10-million-gallon storage tank, 42-inch water line that supplies West Logan with water from First Dam, and Canyon Road improvements.

It all starts with the First Dam Tank & Waterline Project . . . .

SUMMARY: Here are the key details of the project

( aka the short of the long)

Project Timeline (as of November 2026):

  • 2014: Property owners on the North side of Canyon Road give Logan City a land easement by the canal on the North side to connect the existing trail system.

  • 2016: The Water Master Plan calls for a new storage tank on the East side of Logan; original project budget: $20M.

  • 2018 – 2019: The City Council adopts a 35% water rate increase, then 3% a year for four years. Part of that money was described as going toward infrastructure - including a new 10 million gallon tank.

  • Summer 2024: A geotechnical report is compiled for the 10 million gallon tank site assessment & recommendations.

  • FY2025 (July 2024–June 2025): The city spends about $776K on land and rights of way for tank site before any bonds are issued.

  • Fall 2024: Residents form the Canyon Road Coalition and through a petition initially gather 3,800 signatures opposing the project.

  • November 2024: J-U-B Engineers compares 7 possible routes for the waterline, Canyon Road is chosen.

  • January 2025: The council passes Resolution 25-01, allowing up to $60M in water and sewer revenue bonds (max 6% interest, max 31 years). The finance director estimates the real amount at $35M–$51M.

  • February 2025: Public hearing on the bonds. The mayor announces the Canyon Road route and says the other route would have needed at least a 2.5% water rate increase.

  • March 2025: The council approves $10M from water reserves plus $40M in bonds, for a $70M project budget, now more than 3x the original $20M budget.

  • Summer 2025: The first construction phase on Canyon Road begins.

  • September 2025: Public meeting on the Canyon Road Improvement Project, followed by an online survey on path width and tree species. City states 99’ right of way on Canyon Road and estimates $1.5M for a sidewalk on the North side.

  • November 2025: The city begins cutting down 100 year old trees along Canyon Road. The Canyon Road Coalition gathered close to 5,000 signatures over the course of the year in opposition of the tree removal through a petition.

  • November 2025: Former Mayor Holly Daines presented the 66-foot plan to the council, which approved it without a formal vote.

  • November 2025: Property owners are notified of the streetscape plan for Canyon Road - a 99’ ROW is used in the design to accommodate streetscape design.

  • Spring & Summer 2026: The Canyon Road Reconstruction Project (about 600 East to 1500 East) begins.

  • August 2026: City council receives a petition signed by 50 Canyon Road residents asking the city to show evidence of its claimed right of way. The city claims 99 feet; residents' records show 60 feet.

  • Early September 2026: Mayor Mark Anderson recuses himself because he owns property on Canyon Road, handing authority to Finance Director Richard Anderson. Logan City Council has a CLOSED DOOR meeting to discuss “possible litigation, property acquisition, and eminent domain” .

  • October 2026: J-U-B engineers present a Narrative for the 99” right of way on Canyon Road. All documents referenced are prior to 1910, not taking into account any information (surveys, maps, etc) from the past century.

  • November 2026: The City of Logan hires appraisers to meet with residents along Canyon Road to start the condemnation process - assessing the value of the land that the City must purchase to proceed with the current streetscape design for the sidewalk portion of Canyon Road through the use of eminent domain.

  • November 2026: City Council schedules a second CLOSED DOOR meeting to discuss “possible litigation, property acquisition, and eminent domain”.

Okay, that was a lot. It wasn’t very short, and now you have questions. . .

Common Questions, Answered

The right of way is land set aside so the public or a utility can get through. Think of it as a permanent path the City is allowed to use. It typically holds roads, sidewalks, water lines, sewer pipes, power and gas lines, and storm drains. Along Canyon Road, the City already owns or controls a strip of right of way, which it can use for things like the road or sidewalks. If a streetscape design fits inside that existing right of way, the City doesn't have to buy property from landowners. Work outside it would still require buying land or an easement and construction may need temporary access to adjacent property.

What is the Right-of-Way?


Eminent domain is the government's power to take private property for a public project even if the owner does not want to sell, as long as it pays the owner a fair price. The city normally tries to acquire the property through negotiations first. The owner can challenge the price or the need in court. When it comes to Canyon Road, if the City already owns the land it doesn’t need eminent domain. If the project needs private land beyond the right of way, the City has to buy it or buy an easement. Eminent domain is typically used as a last resort if no other solution is available and the project is absolutely necessary.

What is Eminent Domain?


Why is this an issue?

Property owners have been told for the past year that the City has a 99’ right of way and already owns the land needed for the project. The 99’ right of way would not be used in its entirety, however, the City has said repeatedly it would deed back the unused portion to the property owners. In a November council meeting Chair Johnson said he could not guarantee that would happen because the project has to be complete for the council to vote of the land going back to property owners. Now the City is taking steps to take the land through eminent domain. Despite the compensation, people feel they have been misled through this entire process and now are being forced to give up land instead of being treated as members of the community whose voice is part of the decisions that impact their neighborhood.


What can I do as a resident?

Logan City Council is the body that will have to vote before the city could condemn anyone's land and use eminent domain. An email puts your concern on the public record. Focus on your property and your concerns. Ask the city to show the documentation that pertains to your property and what they plan to purchase. Keep all of your communication in writing. Pull your deed and plat from the Cache County Recorder, know your property lines. Keep photos of your yard as it is before so there’s a record of what it looks like. Always have someone review documents prior to signing them.


Shouldn’t I email the Mayor?

Mayor Mark Anderson owns property along the corridor, so he recused himself from decisions on this project on September 1, 2026. He handed authority over it to Finance Director Richard Anderson, who has said he can't change the plans. Because of Mark’s recusal, the mayor shouldn’t weigh in, so an email to him is unlikely to get much of a response. The council is better because they are the body that would have to vote before the city can move forward with eminent domain.

Provided here are the links to the presentation and raw data of the survey done in September of 2025. The survey was completed by 750 people and was advertised through Facebook, signs with QR codes, the mayor’s email and neighborhood email. It’s best if you read the results yourself. *It is of note, that the questions and wording of some parts of the survey came under scrutiny.

What did the survey say?

In the news

(photos link to articles)

The Utah Statesman October 13, 2025

Utah Public Radio November 17, 2025

Logan City Survey Results Oct 2025

SPOILER ALERT!

Independent Canyon Road survey finds trees top priority; most respondents oppose sidewalks on both sides

https://www.cachevalleydaily.com/news/logan-officials-produce-disputed-documentary-claim-to-99-foot-right-of-way-on-canyon-road/article_8bf0e0da-2fe2-43b9-97e2-c2e748c58c91.html

Salt Lake Tribune September 9, 2026

Cache Valley Daily October 2, 2026

Cache Valley Daily October 22, 2026

more to come…..

KVNU Talk October 2025

Still have questions?

We get it, this is complicated stuff.

A multi-year, multi-million dollar city project is complex - there’s no doubt about that. But that doesn’t mean anyone should be left in the dark about it. Asking questions and having a dialogue about a public works project that affects and changes a neighborhood is understandable. Ask away! We’ll do our best to answer…

Logan Canyon, Logan Ut.  Canyon Road project updates that are part of the First Dam Tank & Waterline Project

FACT: Logan, UT is a recognized Tree City USA community.

Disclaimer

The information on [www.canyonroadcares.com] ("the Site") is for general informational purposes only. It is compiled from publicly available sources, which we believe to be reliable, but we have not independently verified it. We make no representations or warranties of any kind, express or implied, about the accuracy, completeness, reliability, timeliness, or suitability of any information on the Site.

No legal advice. Nothing on this Site is legal advice, and no content here should be relied upon as such. Using this Site, or contacting us through it, does not create an attorney-client relationship. If you need legal advice, consult a licensed attorney in your jurisdiction.

No professional advice. The content is also not financial, tax, medical, or other professional advice. Any action you take based on information from the Site is strictly at your own risk.

Third-party sources and links. The Site may reference or link to third-party websites and public records. We do not control, endorse, or guarantee the accuracy of those sources, and we are not responsible for their content or availability.

Information may change. Public information can be outdated, incomplete, or changed without notice. We are not obligated to update the Site and may change or remove content at any time.

Limitation of liability. To the fullest extent permitted by law, [www.canyonroadcares.com] and its owners, operators, and contributors will not be liable for any loss or damage, direct or indirect, that arises from your use of, or reliance on, any information on the Site.

Corrections. If you believe any information on the Site is inaccurate, please contact us through the questions form and we will review it.

By using this Site, you acknowledge and agree to this disclaimer.